Solar panels going up on the barn December 2011
We started the paperwork in mid August. We had wanted all the panels of the 10,000kw system to go on the barn. The cable from the house to the barn was too small to handle the load. So they agreed to install 2 systems, 6,000 Kw at the barn and the remaining 4,000Kw on the house.
While the paperwork for the second system was working its way through, David tore off and re-roofed both sides of the house with 50 year shingles.
They finally came to start the job the week before Christmas, doing the barn first.