Walkway - Bryde testing sand firmness September 2005

walkwaybrydetestingsandfirmnessseptember2005.jpg

The trench was dug down 2', lined with landscape fabric to keep the silt from infiltrating, filled with 16" of gravel, tamped, and then filled with 4" of sand and is being tamped.

The edges are being rebuilt with top soil.

This process, along with most of the others, must be carefully supervised and quality tested.